Construction of Hotel on Shaori Lake to Commence in the Near Future
 
News ArchiveJanuary 28, 2015

Construction of the hotel on Shaori Lake will start at the end of the year. According to  Malkhaz Lomtadze,  Ambrolauri  governor, pipes for drinking water have  been laid,  while electricity installation will be finished  in the near future.


"As soon as the climate allows, a small-scale hotel will be built. Electricity installation will be completed at the end of March,"- Lomtadze notes in a conversation with "Commersant". The governor does not have information about the identity of the investor.

It is known that in the past year in total GEL 64 000 were spent on the water supply project.

 

In total  GEL 150 000 will be allocated from the budget in  2015.

 

Shaori Lake Development Project, included the creation of the resort, was developed in 2008 and GEL 30 000 was spent for this purpose.

 

Shaori reservoir or Shaori lake is  the largest reservoir in Racha-Lechkhumi and  Lower Svaneti region.

 

Shaori reservoir stretches from south-west to north-east – its  length is 7.1 kilometers, the largest width - 2.7 kilometers. The greatest depth is 14.5 meters, the average depth -  9.8 meters, a total area of ??9.2 km2. The water volume is  90.6 million m3


Source:commersant.ge